<div>Help</div>Is there a way to do a cost path analysis with the use of a particular suitability grid as its parameter <div><br></div><div>Thanks for any interesting comments/ feedback<br><div><br>-- <br>Gary A Cummings<br>
FAMU- School of Architecture <br>Tallahassee, Florida.<br>32304<br>Tele : (850)-264-3573<br>
</div></div>